
EU-TRACK
Plastic crane mats
The light alternative
to timber crane mats
Bongossi crane mats have been the standard on soft ground for decades. Our ground protection mats of recycled HDPE take over many of these jobs: lighter, with no water uptake, and joined into one continuous surface by the SPEEDLOCK connector.
Timber or plastic?
The direct comparison
Sustainability
Tropical wood or recycled plastic

Applications
Where our mats replace timber mats

- Access roads for excavators, wheel loaders, trucks, wheeled and tracked vehicles
- Temporary roads and site entrances, 2 to 10 m wide
- Site set-up areas and passing places
- Ground protection on meadows, fields and sensitive soil
A 40 t truck carries 60 Type 1 mats: about 510 m² of roadway per delivery.
Benefits
Fast to layUp to 250 m² per hour, without specialists or special tools
Firmly joinedSPEEDLOCK connector: one continuous surface
CraneableLifting points for hooks, straps, eye bolts or a forklift
Slip-resistantProfile on top and bottom, a firm grip in any weatherTo be fair
Where timber can be the better choice
Frequently asked questions
What is a crane mat?
A mat of hardwood beams, usually Bongossi, that forms a drivable path for excavators and other machines on soft ground. Plastic crane mats such as our ground protection mats do the same job, made of recycled HDPE.
How heavy is a timber crane mat?
A Bongossi mat of 5 × 1 m and 10 cm thickness weighs about 600 kg. Our Type 1 mat weighs 334.4 kg for 8.5 m²; Type 2 weighs 169.9 kg for 4.2 m².
How much does a plastic mat carry?
Our mats carry up to 150 t per mat on dry, paved ground, up to 120 t on dry, unpaved ground and up to 60 t on wet, unpaved ground. The figures apply per mat and depend on site conditions and correct handling.
What does a site road of mats cost?
That depends on length, width and duration. Our calculator compares the total cost of a road of mats with gravel and steel.
Can the mats bridge trenches?
No. The mats are made to rest on the ground over their full area. Steel plates are the right choice for bridging trenches.
How are the mats laid?
The mats have lifting points and can be laid with lifting hooks, straps, eye bolts or a forklift. The SPEEDLOCK connector joins them in about 2 minutes per mat, from 2 people.